One template, two operations
Two templates, each configured for two different organizations. None of it needs development.
The same roll call, at a school and at a security company
Starting template: Pase de lista docente
- Sections
- High schoolThe template's four: arrival, group and classroom, classroom condition and notes.
- Private security company"Group and Classroom" and "Classroom Condition" removed; "Handover" (who hands over the post and what happened) and "Post equipment" (radio, flashlight, logbook) added.
- Scale
- High schoolYes / No on classroom condition; arrival is recorded, not scored.
- Private security companyYes / No on post equipment; the radio is critical.
- Rule and action
- High schoolClassroom projector not working: action to campus maintenance, due in 1 day.
- Private security companyMissing equipment: the zone supervisor is notified and an action to replace it is due in 1 day.
- Evidence
- High schoolA photo only when the classroom has a finding.
- Private security companyA photo of the post logbook at every handover.
- Site and schedule
- High schoolInside the campus geofence, around the first class. With no check-in in its window, the coordinator is notified.
- Private security companyInside the client site's geofence, at the start of every shift. With no handover recorded, the zone supervisor is notified.
- Who sees what
- High schoolEach coordinator sees their campus; academic leadership, all three.
- Private security companyEach supervisor sees their sites; operations, all forty.
The same safety audit, at a plant and at a distribution center
Starting template: Auditoría de seguridad industrial
- Sections
- Metalworking plantThe template's six, plus "Lockout" for the shift change.
- Distribution center"Guards and Machinery" removed; "Mobile equipment" added (forklifts, pallet jacks, docks).
- Scale
- Metalworking plantCompliant / Non-compliant / N/A. Guards are critical: one Non-compliant fails that part of the audit.
- Distribution centerA 1-to-5 scale per item; the branch score feeds a monthly ranking.
- Rule and action
- Metalworking plantMissing guard: immediate stop, action to the shift lead, evidence at closure.
- Distribution centerForklift without its daily check: action to the branch manager, due in 2 days.
- Evidence
- Metalworking plantA photo on every finding and the area owner's signature.
- Distribution centerA photo on every finding and of the forklift's daily checklist.
- Site and schedule
- Metalworking plantOne walk per shift, inside the plant's geofence.
- Distribution centerOne visit per branch per week, each inside its own geofence, during opening hours.
- Who sees what
- Metalworking plantSafety sees everything; each shift lead, their shift.
- Distribution centerEach manager sees their branch; the regional supervisor, all twelve; head office, the ranking.
What does not change
- The app works offline in all four cases and syncs when the connection returns.
- Every template version is recorded; a closed record does not change when the template does.
- Results come out as data: history, trends and exports, never as paper.
Tell us which process you want to verify. We will show you Cuaxar with your own form.
Request a demo